MI-8/RR-8 Split
MI-8 and RR-8 taken from up-stream looking down-stream.
MI/RR Injection Lines from the MI aisle view looking down stream.
A flooded section of Main Injector Tunnel: Magnets and Reflection
Fermilab Main Injector Flood
Installation photos of new 53 MHz RF cavities in Recycler. 3000+ pounds of copper in each cavity!
RR extraction lambertson and beam box (original installation; not current).
RR extraction mirror magnets down stream of lambertson and beam box - original installation.